Key Benefits
-
Ultimate Safety
-
Live components locked in stainless-steel, SF₆-pressurized chambers
-
IP67-rated enclosure ensures dust- and flood-proof operation
-
Zero exposure to arc flashes or accidental contact
-
-
Long-Term Reliability
-
Over 30 years of service life under GB/DL standards
-
Zero SF₆ leakage, eco-friendly insulation
-
Type-tested at China’s National HV Test Center
-
-
Space & Time Savings
-
Compact footprint with expandable busbar system
-
Rapid on-site installation (< 4 hours via modular assembly)
-
Minimal civil works: ideal for tight urban sites
-
-
Smart Grid Ready
-
Supports IEC 61850 communication protocols
-
Optional metering (M) and voltage transformer (PT) cabinets
-
Seamless SCADA/IoT integration
-
Product Parameters
|
Item
|
Parameter
|
|
Arc extinguishing type
|
Vacuum
|
|
Rated Voltage
|
12kV
|
|
Rated Frequency
|
50Hz
|
|
Rated current
|
630A
|
|
Temperature rise test
|
1.1lr
|
|
Rated frequency 1min withstand voltage
|
Phase-to-phase and phase-to-ground outlets 42kA, 48kA
|
|
Rated lightning impulse withstand voltage peak (1.2/50us)
|
Phase-to-phase and phase-to-ground disconnect 75kV, 85kV
|
|
Auxiliary and control circuit short-time frequency withstand voltage
|
2kV
|
|
Rated short-circuit breaking current
|
25kA
|
|
Rated short-circuit breaking current / duration
|
Main circuit, earth switch earth circuit 25/4kA/s, 21.7/2kA/s
|
|
Rated peak withstand current
|
63KA
|
|
Rated short-circuit closing current
|
63KA
|
|
Rated active load current
|
630A
|
|
Partial discharge (measured value at 1…2Ur)
|
≤ 20pC
|
Core Technology: Sealed Modular Architecture
Unlike traditional air-insulated switchgear, the SRM6-12 encapsulates all live parts and switching mechanisms in stainless-steel GIS compartments filled with SF₆. This approach:
-
Eliminates contamination risks—dust, moisture and corrosion have no path to live parts.
-
Ensures consistent performance—sealed chamber maintains dielectric integrity.
-
Reduces maintenance—no periodic cleaning or live-line servicing required.
Model Configuration Guide
Example: SRM6-12-CF/630IR
- SRM6-12: GIS ring main unit, 12 kV standard (24 kV optional)
- CF: Load Switch (C) + Fuse Combo (F)
- 630: Rated current (A)
- I: Left-side expansion
- R: Right-side cable entry
Cabinet Options:
- C: Load Switch
- F: Fuse Combo
- V: Vacuum Circuit Breaker
- SV/SL: Busbar Segmentation
- M: Metering
- PT: Voltage Transformer
Expansion & Entry:
-
I / D / ID: Left, Right or Both-sides expansion
-
L / R / LR: Left, Right or Dual-side cable entries

How to Choose Your SRM6-12
-
Voltage Level
-
12 kV: Standard urban grids
-
24 kV: Heavy-duty industrial parks
-
-
Current Rating
-
630 A: Commercial/residential networks
-
1250 A: Large industrial loads
-
-
Footprint & Layout
-
Compact sites: Front-entry (no suffix)
-
Scalable networks: Bidirectional expansion (ID)
-
-
Automation Needs
-
IEC 61850: Add M/PT cabinets for real-time data
-
Remote control: Integrate with existing SCADA
-
FAQ
Q1: Why choose gas-insulated switchgear over air-insulated units?
A: GIS chambers eliminate arc-flash hazards, block contaminants and require no live-line maintenance—critical for densely packed substations.
Q2: Can SRM6-12 panels connect to my SCADA system?
A: Absolutely. All units are IEC 61850-compliant. Simply specify M (Metering) or PT (Voltage Transformer) modules for seamless integration.
Q3: What are typical delivery times?
A: Standard configurations ship within 15 days. Custom, multi-cabinet assemblies take up to 25 days due to in-factory busbar testing.
Why Partner with ZHENGXI?
-
OEM Manufacturer: Direct factory pricing, no intermediaries
-
Certified Quality: GB/DL/T404 type-test approval
-
Comprehensive Support: 25-year technical assistance & spare parts
-
Tailored Solutions: Custom cabinet fusion per site layouts
🔧 Experience Next-Level Distribution Resilience
Contact our ZHENGXI engineers today for a tailored SRM6-12 proposal and discover why our gas-insulated switchgear sets the industry standard.








